.:: BATAM-BINTAN BRIDGE::. |
|
Planning in Progress.....!! |
|
| |
| Construction Method "click stage to view" |
Untitled Document
| |
| A |
Precast Balanced Cantilever Segment |
| |
Stage 1 |
| |
 |
| |
Installation of gantry to lift the segment |
| |
For precast segment, during the constuction period, the freeboard elevation of the bridge should be same to the final result |
| |
Stage 2 |
| |
Stage 3 |
| |
Stage 4 |
| |
|
| B |
Cast in Situ Cable Stayed Segment |
| |
Stage 1 |
| |
Stage 2 |
| |
Stage 3 |
| |
Stage 4 |
| |
|
|
| |
|
|
 |
|
|
|